HVAC Upgrade Engineering Study


Induspec was retained by a large local manufacturing & repair facility to assist them in determining a long-term strategy for their HVAC needs.  Induspec took an inventory of all HVAC equipment, completed a condition assessment of the equipment, and ran building energy modelling on a building-by-building basis to determine each building’s individual HVAC needs.  Induspec ultimately provided a comprehensive report with several options for the HVAC upgrade, and with each option a class “D” cost estimate.  An overall schedule was assembled for the project that allowed for a phased implementation that matched the project funding allocation.

VIEW PROJECT SHEET
  • Date May 31, 2019
  • Tags Energy, Industrial